A number of people have asked, what exactly is happening at Smash Palace. Many of you will be aware that we have been locked in debate with Otakaro Ltd, and latterly LINZ, for the past few years over their proposed walkway which was proposed to go right through our site.
The original proposal was eventually abandoned by the authorities, and the walkway will now go down the side of the site. This requires us to move sideways by 3 metres. So that’s what we are in the process of doing. It’s a big job. We’re not sure how long we will be closed but we will keep you informed of progress.
In the meantime, we will continue to use Zoom for Tuesday Club.
Leave a Reply